Karbonsteel Engineering Limited (KEL) is an engineering solutions provider specializing in the design, manufacturing, and supply of high-quality structural steel products for diverse industries. The company caters to sectors such as steel plants, railway bridges, oil & gas refineries, and infrastructure projects, playing a key role in construction, expansion, and modernization of large-scale facilities.
KEL operates two advanced manufacturing facilities in Gujarat and Maharashtra with a combined annual capacity of 32,400 MT. These facilities are equipped to produce heavy steel structures, pre-engineered buildings (PEBs), and steel bridge components.
Key Offerings:
- Heavy Steel Fabricated Structures: Large components designed for heavy industrial and infrastructure load applications.
- Precision Fabricated Steel Structures: Customized steel parts requiring high dimensional accuracy for process industries.
- Steel Bridge Structures: Robust components for railway and road bridges with strong load-bearing capacity.
- Pre-Engineered Buildings (PEBs): Cost-effective, modular steel building solutions for industrial and commercial projects.
As of January 31, 2025, the company employed 349 professionals, supporting its engineering, manufacturing, and project execution capabilities.

Karbonsteel Engineering IPO – Details
IPO Opening Date | 08 September 2025 |
IPO Closing Date | 10 September 2025 |
Issue Type | Book Built Issue IPO |
Issue Size | Total Issue: 37,29,600 Shares Worth ₹59.30 Crore Fresh Issue: 30,39,600 Shares Worth ₹48.33 Crore Offer For Sale: 6,90,000 Shares Worth ₹10.97 Crore |
Face Value | ₹10 per equity share |
IPO Price | ₹151 – ₹159 per share |
Market Lot | 800 Shares |
Min Order | 800 Shares [ 1 Lot ] |
Listing At | BSE SME |
Registrar | Maashitla Securities Pvt.Ltd. |
QIB Shares Offered | 50% |
NII Shares Offered | 15% |
Retail Shares Offered | 35% |
Karbonsteel Engineering IPO – Date Schedule
IPO Open Date | 08 September 2025 |
IPO Close Date | 10 September 2025 |
Basis of Allotment | 11 September 2025 |
Initiation of Refund | 12 September 2025 |
Credit of Shares to Demat | 12 September 2025 |
IPO Listing Date | 15 September 2025 |
Cut-off time for UPI mandate confirmation | 5 PM on September 10, 2025 |
Karbonsteel Engineering IPO – Lots Size & Price
Application | Lots | Shares | Amount |
---|---|---|---|
Retail (Min) | 2 | 1,600 | ₹2,54,400 |
Retail (Max) | 2 | 1,600 | ₹2,54,400 |
S-HNI (Min) | 3 | 2,400 | ₹3,81,600 |
S-HNI (Max) | 7 | 5,600 | ₹8,90,400 |
B-HNI (Min) | 8 | 6,400 | ₹10,17,600 |
Competitive Strengths
- Capabilities to execute large-scale industrial and infrastructure projects.
- Strong Order Book.
- In-House manufacturing and testing capabilities.
- Strong relationship with customers.
- Experienced Promoters with strong management team having domain knowledge.
Company Promoters
- Shrenik Kirit Shah
- Mittal Shrenik Shah
Company Financials
Period | Total Revenue | Total Expense | Profit After Tax | Total Borrowings |
---|---|---|---|---|
31 March 2023 | ₹155.89 Cr | ₹149.08 Cr | ₹ 5.11 Cr | ₹48.52 Cr |
31 March 2024 | ₹218.77 Cr | ₹206.08 Cr | ₹9.42 Cr | ₹59.83 Cr |
31 March 2025 | ₹273.91 Cr | ₹254.80 Cr | ₹14.16 Cr | ₹78.55 Cr |
Key Performance Indicator
KPI | Values |
---|---|
ROE | 27.19% |
ROCE | 24.63% |
Debt/Equity | 1.30 |
RoNW | 23.45% |
PAT Margin | 5.19% |
EBITDA Margin | 13.41% |
Price to Book Value | 2.92 |
Pre IPO | Post IPO | |
---|---|---|
EPS (₹) | 12.75 | 10.01 |
P/E (x) | 12.47 | 15.88 |
Object Of The Issue
Objects of the Issue | Expected Amount (in Crore) |
---|---|
Funding of capital expenditure towards the expansion of the existing Umbergaon facility through the construction of new sheds. | ₹12.29 |
Repayment of a portion of certain borrowings availed by the Company. | ₹3.08 |
To meet the Working Capital requirements. | ₹25.25 |
General Corporate Purposes. | – |

✅Strengths
- Diverse offerings: heavy steel structures, bridges, PEBs, precision components.
- Two manufacturing plants (Gujarat & Maharashtra) with 32,400 MT annual capacity.
- Prestigious projects like Mumbai–Ahmedabad Bullet Train Bridge.
- Recognized by L&T for highest fabricated structures in FY 2024-25.
- Skilled workforce of 349 employees.
⚠️Risks
- High revenue dependence on Gujarat.
- Intense competition from large and regional players.
- Thin margins due to contract-based competitive bidding.
- Clients may insource fabrication, reducing demand.
- Pending cheque dishonour cases under NI Act.
Karbonsteel Engineering IPO Promoter Holding
Pre Issue Share Holding | 72.17% |
Post Issue Share Holding | – |
Karbonsteel Engineering IPO Prospectus
Company Contact Information
Karbonsteel Engineering Ltd. B-8 Ratnadeep Cosmopolitan Chs Ltd, 140-141 S.V. Road, Nr. Shoppers Stop, Andheri (W), Mumbai, 400058 Mumbai, Maharashtra, 400058 Phone: +91-22- 61872821 Email: info@karbonsteel.com Website: https://www.karbonsteel.com/ |
Karbonsteel Engineering IPO Registrar
Maashitla Securities Pvt.Ltd. Phone: +91-11-45121795-96 Email: investor.po@maashitla.com Website: https://maashitla.com/allotment-status/public-issues |
Karbonsteel Engineering IPO Lead Manager(s)
1. Seren Capital Pvt.Ltd. |
Karbonsteel Engineering IPO FAQ

What is Karbonsteel Engineering IPO? Karbonsteel Engineering IPO is an SME IPO. The issue is priced at ₹151 – ₹159 per equity share. The IPO is to be listed on BSE SME. |
When Karbonsteel Engineering IPO will open? The IPO is to open on 08 September 2025 for QIB, NII, and Retail Investors. |
What is Karbonsteel Engineering IPO Investors Portion? The investors’ portion for QIB – 50%, NII – 15%, and Retail – 35%. |
What is the Karbonsteel Engineering IPO Size? Karbonsteel Engineering IPO size is ₹59.30 Crore. |
What is Karbonsteel Engineering IPO Minimum and Maximum Lot Size for Retail? The minimum bid is 1600 Shares with ₹2,54,400 amount, while the maximum bid is 1600 Shares with ₹2,54,400. |
What is the Karbonsteel Engineering IPO Allotment Date? Karbonsteel Engineering IPO allotment date is 11 September 2025. |
What is the Karbonsteel Engineering IPO Listing Date? Karbonsteel Engineering IPO listing date is 15 September 2025. The IPO is to be listed on the BSE SME. |
